Orleans Conservation Commission
Hearing Meeting Nauset Room September 27, 2011
8:30 a.m. Call to Order
Certificate of Compliance
Joseph & Dorothea Dumczius (2009) 52 Pershing Lane
The request for a Certificate of Compliance for an Order of Conditions for the installation of a new septic system to serve an existing dwelling and the pumping and abandonment of an existing septic system.
Jeffrey & Trisha Karlson (2010) 11 Sages Way
The request for a Certificate of Compliance for an Order of Conditions for the installation of an in-ground swimming pool, construction of retaining walls, fence, shed, propane tank, and underground utilities.
Administrative Reviews
Jim Hughes 5 Skaket Circle
The proposed removal of one leaning locust, top two additional damaged locusts, and removal of one broken limb from of a maple tree as a result of the recent storm event. Work will occur within 100’ of the Edge of a Salt Marsh and the Cape Cod Bay A.C.E.C. Work to be done by A to Z Treez.
Genevieve White 30 Karens Way
The proposed removal of a broken maple as a result of the recent storm event. Work will occur within 100’ of the Edge of a Bordering Vegetated Wetland.
William Grant 21 Ellis Road
The proposed topping of a locust tree and the removal of a brush pile. Work will occur within 100’ of the Top of a Coastal Bank, Edge of Marsh, and the A.C.E.C.. Work to be done by A to Z Treez
Ginia Pati 25 Ellis Road
The proposed removal of one uprooted locust tree and one pitch pine tree. Work will occur within 100’ of the Top of a Coastal Bank, Edge of Marsh, and the A.C.E.C.. Work to be done by A to Z Treez
Don & Anne Poyant 6 Nichols Road
The proposed removal of invasive vines from trees. Work will occur within 50’ to 100’ of the Edge of a Bordering Vegetated Wetland. Work to be done by hand by the applicant.
Pilgrim Lake Terrace Association 19R Pilgrim Lake Terrace East
The proposed re-routing of an existing access path. Work will occur within 100’ of the Top of a Coastal Bank, Land Subject to Coastal Storm Flowage, and the Pleasant Bay A.C.E.C. Work to be done by Wilkinson Ecological Design.
Orleans Yacht Club 39 Cove Road
The proposed repairs to an existing licensed revetment. Work will occur on Land Subject to Coastal Storm Flowage, Coastal Bank, and Salt Marsh. Work to be done by the Orleans Yacht Club.
Chairman’s Business
Approval of the Minutes from the Meeting on August 23, 2011 and September 20, 2011
Other Member’s Business
Administrator’s Business
Discussion: Landscape Plan for 27 Standish Road by Philip L. Cheney
Site Visits
Town of Orleans Highway Department Tar Kiln Road
by GHD Inc. Assessor’s Map 96, within road layouts between parcels 4, 5-1, 5-2, & 34. The proposed stormwater improvements to the roadway layout. Work will occur within 100’ of the Top of a Coastal Bank, Salt Marsh, and the Pleasant Bay A.C.E.C.
Elliot & Nancy C. Johnson 85 Brick Hill Road
by Ryder & Wilcox, Inc. Assessor’s Map 29, Parcel 4. The proposed construction of a barn. Work will occur within 100’ of the Edge of Wetland.
176 LLC & Peter H. Carter 176 &178 Quanset Road
by Ryder & Wilcox, Inc. Assessor’s Map 94, Parcel 4, and Assessor’s Map 93, Parcels 21-1 & 21-4. The proposed construction of a new single family dwelling and septic system with I/A technology on an existing foundation, including an addition on a new foundation; the removal of a second existing family dwelling; the pumping &removal of two cesspools; & the pumping &removing of an existing septic system. Work will occur within 100’ of the Top of a Coastal Bank, Salt Marsh, Land Subject to Coastal Storm Flowage, and in the Pleasant Bay A.C.E.C.
The proposed construction of a new gravel driveway & parking area; the installation of new underground utilities (water, electric, telephone, & cable) to the proposed renovated single family dwelling; & the removal of a shed. Work will occur within 100’ of the Top of a Coastal Bank, Salt Marsh, Land Subject to Coastal Storm Flowage, on a Coastal Bank, and in the Pleasant Bay A.C.E.C.
|